Education First, International Language Centre, Brighton

Client: Education First
Location: London
Services: Refurbishment

<< Back to our work

Remodelling of an entire Grade I Listed building including reception, teaching, administration, kitchen, refectory and WC areas.

This grand building was brought into the 21st century with installations of new power, data, lighting, AV equipment, heating and air conditioning systems throughout.

A comprehensive restoration

All aspects of the building were restored, including reviewing and making safe lathe and plaster ceilings and fibrous plaster cornices and enrichments.

Specialist refurbishment works included new timber flooring to the reception area to match other areas within the building, and within the grand entrance hall, the patterned tiled floor was carefully lifted and re-laid to reflect the original condition. Finally, the entire building received a very colourful but sympathetic palette of colours to highlight and enhance the various features in each of the rooms.

Essential external works

Externally, works entailed replacement of pavings to the various courtyards and the introduction of hardwood seats, benches and planters to compliment the character of the building. A number of essential roofing works were undertaken and a steel spiral staircase was installed to one of the central courtyards to cater for the increased occupancy of the building and the necessity for improved fire escape routes.

A triumph of collaborative working

This beautiful historic Brighton town house belies the contemporary feel and facilities now available inside; whilst reflecting the current hi-end design trends, there is a respectful nod to this grand old Sussex Square building. A triumph of collaborative working between our client and the professional and construction teams, we are proud to note that the completed project was met with great acclaim on opening day.

Education First Brighton Project Highlights

  • Grade I Listed Building brought into the 21st Century
  • All aspects of the building were restored
  • Specialist refurbishment works including co-ordinated timber flooring
  • Installaiton of new power, data, lighting and AV equipment
  • External works included esential roofing, and improvement of fire escape routes

Education First Brighton Project Gallery

Your project

We would love to hear about your next transformation project, and help you create a stunning space. When delivering refurbishment and fit-out projects, we have a passion for exceeding our clients expectations, and providing them with a stunning space that fulfils their needs for years to come.